Introduction: Water and electricity renovation in home decoration is a very important concealed project. Everyone needs to strictly control all aspects of water and electricity renovation, and not ignore the details. Once problems arise,Not only does it take a lot of effort to repair, but it also requires a lot of effort,It will also bring many inconveniences to life. So, what are the precautions to be taken when renovating water and electricity in home decoration?Water and electricity renovation can be divided into waterway renovation and circuit renovation. Let's take the following steps:Decoration case diagramThe editor will introduce relevant precautions from these two aspects.
Precautions for home renovation of water and electricity: Do not overlook the details of hidden projects
Hydroelectric renovation can be divided into waterway renovation and circuit renovation. Below, the editor will provide a detailed introduction to the precautions needed for these two aspects of renovation. 1、 Waterway renovation:
1The renovation of waterways should follow the principle of "walking on the top but not on the ground, and walking vertically but not horizontally". The walking on the top must be fixed with metal pipe clamps, and the spacing should not be greater than60Centimeters.
2The shower outlet should be left hot and right cold, with a distance between hot and cold water15In centimeters, ensure that the outlet is on the same horizontal line and verify the specific size of the brick to avoid leaving the outlet on the waistline.
3The water circuit conduit cannot be in the same slot.
Precautions for home renovation of water and electricity: Do not overlook the details of hidden projects
4Horizontal grooves are not allowed on the wall.5After carrying out drainage renovation, it is necessary to conduct a water pipe test to ensure that each drainage is unobstructed.
6After the water modification, a pressure test must be carried out to suppress the pressure8About kilograms, time is30minute.7Mobile floor drain
DrainagePVCMaterials should be used50A drain pipe with a diameter.
Precautions for home renovation of water and electricity: Do not overlook the details of hidden projects
8The sealing groove on the wall must be kept flat, and the ground joint cannot be higher than the ground2Cm for easy tiling later.9Adding or moving floor drains requires raising the ground. If you want to seal the drain with deep water, the ground needs to be raised at least10In centimeters, the ground can be raised partially or completely.10It is best not to add another washing machine floor drain on the floor drain, otherwise it is easy to cause water backflow. If the displacement or increase of water in the basin does not involve this issue.
11Changing the toilet on a flat level also requires raising the floor. Toilet shift is usually done with a shifter, but it can only be moved10Centimeters and can easily cause blockage.
12Slots cannot be made in the underfloor heating or heating pipeline area.
Precautions for home renovation of water and electricity: Do not overlook the details of hidden projects
2、 Circuit modification:
1Circuit renovation requires point-to-point and nearby lead wires to ensure that the circuit is fully live and easy to maintain in the future.2It is not allowed to open horizontal grooves on the wall3The wire conduit must be fixed with metal pipe clamps, and the spacing cannot be greater than60Centimeters. Fix the ground with cement where holes cannot be drilled.
4Telephone and television cables cannot be threaded together in the same pipeline.
Precautions for home renovation of water and electricity: Do not overlook the details of hidden projects
5The connection between the newly made cassette conduit and the junction box should be connected with a locking buckle.
6After using a straight line between the conduit, the connection points on both sides of the straight line should be smearedPVCGlue.7Strong electricity must undergo a power on test. The socket can be tested with electric tools, and the light path can be tested with a light bulb.8A multimeter must be used for on/off testing of weak electricity.
9The sealing groove on the wall should be flat, ensuring that the conduit can be smoothly tiled or laid on the floor in the future.
Precautions for home renovation of water and electricity: Do not overlook the details of hidden projects
10、The junction box cannot be sealed, and it needs to be covered with a whiteboard in the later stage. The above article is about the precautions for water and electricity renovation in home decoration shared by the editor. Water and electricity renovation is an important concealed project in home decoration, and everyone must pay attention to every detail of water and electricity renovation to ensure the construction effect of the entire concealed project is scientific, reasonable, practical and convenient. I hope the editor's article on precautions for water and circuit renovation is helpful to everyone.
Zhongyiju Decoration Network has the latest and most comprehensive decoration design cases and knowledge, the most popular decoration news information, and more tips on decoration construction and decoration matching. To learn more about decoration quotes, decoration designs, decoration companies, decoration prices, decoration strategies, decoration knowledge Q&A, decoration cases, and decoration renderings, please pay attention to China's leading one-stop decoration consultant protection platform, Zhongyiju Decoration Network——Zhongyiju Decoration Network!
|