The final work of the decoration includes the installation of lighting fixtures on the ceiling, wallpaper pasting, floor paving, and the installation of household appliances, sanitary ware, and hardware accessories. Although it is a finishing job, it should not be taken lightly. If not done well, it will not only affect the progress of soft decoration, but also affect the quality of life in the future.Fanhai International Lanhai Park Apartment PlanThe designer reminds everyone
The installation of lighting fixtures is a crucial task. According to the installation location and purpose of the lighting fixtures, the minimum cross-sectional area of the wire core leading to each lighting fixture should comply with relevant regulations and specifications;When installing electrical lighting devices in brick and stone structures, the load-bearing capacity of the fixing components should match the weight of the electrical lighting device;The wiring requirements for the screw socket lamp head should be connected to the terminal of the central contact, and the neutral wire should be connected to the threaded terminal;The insulation shell of the lamp head should not be damaged or leaked, and the lamp head with a switch should not have any exposed metal parts on the switch handle;The light wire of the hanging chain lamp should not be subjected to tension, and the light wire should be woven together with the hanging chain;The centerline deviation of lamps installed in rows in the same room or place should not exceed5Millimeters.

Wallpaper pasting usually involves pasting the first wallpaper at the door or corner, using a scraper to gently scrape the wallpaper from top to bottom and from inside out, squeezing out bubbles and excess glue to make the wallpaper flat and tightly adhere to the wall.

When cutting excess wallpaper, the blade used should be sharp to avoid burrs. After cutting, use a sponge dipped in water to completely wipe off any adhesive residue on the surface of the wallpaper to prevent it from turning yellow. After pasting the wallpaper, close the doors and windows,24Do not open windows inside, let the wallpaper dry slowly.

Before laying the floor, it is necessary to carefully clean the floor to ensure that it is clean, dry, stable, flat, and free of floating soil. Generally, when installing the floor, the half facing the door should be installed first. In this way, until the end of installation, the size of the floor is not neat, and when it needs to be sawn for installation, due to the fact that the other half of the house usually places various furniture, the uneven floor will also be blocked by the furniture, It will not affect the overall aesthetics. During the paving process, attention should be paid to maintaining the flatness of the floor surface and reducing the height difference between the joints between the floors. During acceptance, the floor surface should be smooth, with no damage or obvious scratches on the paint surface. There should be no obvious abnormal noise in the main walking area.

The installation of household appliances such as water heaters, refrigerators, and air conditioners should be carried out by professional personnel. The optimal installation position for air conditioners is generally above the head of the bed or the position of the person. If the optimal installation position cannot be obtained due to furniture or other reasons, it should be selected in the diagonal direction of the room door.

The most important thing in installing sanitary ware is to pay attention to the firm fixation of sanitary ware and ensure the tightness of pipeline interfaces. When the drainage plug is connected to the washing basin, the overflow hole of the drainage plug should be aligned with the overflow hole of the washing basin as much as possible to ensure that the overflow part is unobstructed. After installation, the upper end face of the drainage plug should be lower than the bottom of the washing basin. During the installation process of hardware accessories, Chinese medicine should pay attention to protecting the finished product and not damaging the chrome plating layer. The height of the hot and cold water faucet or mixed faucet in the bathtub should be higher than the upper surface of the bathtub150Millimeters, attention should be paid to the height of the shower head above the ground, so that the tallest member of the family can stand comfortably below.
"Small gifts, come to Huiyi to support me"
No one has offered a reward yet. Give me some support
comiis_nologin
You need to log in before you can reply Sign in | Register Now WeChat login

Point rules of this version

Pepperstone-4
more

Customer Service Center

238-168-2638 QQcustomer service Monday to Friday 20:00-24:00
Quick reply Back to top Back to list